    Comprehensive Monitoring and Safety Measures to Enhance Cliff Stability at Afton Down

    In 2002 ITM, now SOCOTEC Monitoring UK Ltd, was awarded the contract to install instrumentation to monitor the cliff alongside Military Road.

    Summary of the works

    Client – Isle of Wight Council

    Duration  2001 – current
    Monitoring System – Settlement Cells, Tiltmeters, VW Extensometers – ARGUS Monitoring Software

    The monitoring system comprised of a number of tiltmeters buried alongside the road to monitor for any rotation along with draw wires installed in pairs within galvanised tubes  running from alongside the road to positions halfway and 80% of the way to the cliff edge.

    All of the monitoring was set to, on alarm, contact the local police station as well as turn on red lights and a warning sign at either end of the section to prevent cars entering the area.