Construction of a reinforced concrete weir to lift and stabilise the water levels in channels running through Maidenhead town centre, making the waterway accessible for small boats and other water-related activities.
Works included lining the waterway bed to connect it to previous channel works, provision of a wetland area, and installation of bank retention to leave a natural edge to the waterway. The weir complex includes a fish and eel pass and boat rollers.
Our Services
Appointed from the outset of the project, pre-contract responsibilities included:
Advice on procurement routes
Management of the tender process
Compilation of the contract
Post-contract services included:
Project management as per the NEC4 contract
Advising on and issuing project manager's instructions
Commercial advice
Preparation of interim valuations
Preparation of monthly cost reports
Assessment of compensation events
Conclusion of contractual requirements, including issuing and checking defects schedules